Steel Building Insulation provided the insulation and facing material for a new-construction project in Albion, New York. Designed as an equestrian building for housing horses, the new-construction metal building is 75’x150’x18′ in size, and it now boasts a total of 20,447 square feet of insulated space.
Steel Building Insulation supplied the insulation, facing material and accessories for this project at McGuire Air Force Base near Trenton, New Jersey. The retrofit job for a building on McGuire Air Force Base, located about 16 miles outside Trenton, New Jersey, required insulating a total of 12,978 square feet of space.
Steel Building Insulation supplied the insulation, facing and accessories for this project in Dayton, New Jersey. The job involved providing the insulation and related materials for a new-construction metal warehouse building based on architectural specifications.
Steel Building Insulation supplied the insulation and facing materials for this project in Toms River, New Jersey. Installed in the building’s roof are (260) rolls of high-performing 2 5/8″ fiberglass insulation, encompassing a total of 26,000 square feet of insulated space.
Steel Building Insulation provided the insulation blankets, facing material and various accessories for this new construction project in Great Falls, Montana. Installed in the building’s roof is 34,962 square feet of 6″ R-19 fiberglass insulation, which drastically reduces energy costs while enhancing user comfort and minimizing the presence of outside noise.
Steel Building Insulation provided the insulation, facing and accessories for this project in Joplin, Missouri. The new-construction insulation job involved insulating a total of 18,544 square feet of space within a 100’x120’x16′ building.
Steel Building Insulation provided the insulation, facing material and related accessories for this project in Richmond Township, Michigan. The job for Dundee, Michigan-based Salenbien Trucking and Excavating involved insulating a total of 26,931 square feet of building space.
Steel Building Insulation supplied the insulation, facing material and accessories for this project in Grayling, Michigan. The retrofit job for an existing 50’x100’x16′ metal building involved providing insulation for both the roof and walls, creating a total of 9,250 square feet of insulated space.
Steel Building Insulation supplied the insulation for this project in Troy, Michigan. The insulation was supplied to Troy-based 3G Seamless Gutters, Siding & Trim, a leading exterior contracting company, as part of a re-roofing job for an existing 200’x160′ metal building.
Steel Building Insulation supplied the insulation, facing material and various accessories for this project in Lowell, Michigan. A total of 27,724 square feet of space in the First Baptist Church was insulated by Bowne Construction, and the end result is a highly energy-efficient building that maintains comfortable, consistent interior temperatures year-round.